Monastery of St. Gertrude

The 14,000 sq. ft. project renovation goals were to increase energy efficiency, accessibility and convert dorm living space to business space. Energy efficiency included replacement of over 270 custom-sized windows. The windows were replaced wood metal clad windows with attention to the historical lines and detail. Accessibility was another challenge with the project. The original…

Read More

Clearwater Valley Hospital

ER Expansion Expanded the ER from one to a four bed facility as part of the project and upgraded the emergency generator. CT Remodel Renovated existing radiology to accommodate a CT scanner. Ten years later we were selected again to modify the same space to accommodate new updated equipment.  

Read More

Northwest Media

Renovation  to restore and preserve historic levels with remodeled storefront for historic accuracy. Interior 1st floor ABC removed existing walls, built reception and main office, photo studio capable of video commercials and added green room. 2nd floor remodel included removing existing apartments to make offices for employees. Architectural design by Castellaw Kom Architects. Award of…

Read More

TD&H Engineering

Renovation of tri-level business to restore and preserve historic levels with remodeled storefront for historic accuracy. ABC removed existing walls, built reception desk, 2 bathrooms, 10 private employee offices, kitchen, and conference room. Architectural design by Castellaw Kom Architects.   Award of Merit Lewiston Historic Preservation Commission Orchid Award

Read More

Lapwai Junior High Addition

The District #341 project, included: Demolition of the 50,000 sq. ft. old high school, gym and Jr. High Construction of a 19,024 sq. ft. gymnasium and support facilities Construction of a 6,232 sq. ft. Jr. High classroom addition 7,511 sq. ft. partial renovations of 2 computer labs, and a 350-seat auditorium Installation of 13,000 sq.…

Read More

Fairhaven Homes

Fairhaven is a HUD funded project for HAAC. The project developed 1.4 acres into 5 single level structures totaling 17,728 sq. ft., 13,000 sq. ft. parking, new utilities, landscaping and 500 linear feet of street/walk/curb improvement. This project was successfully finished on time and on budget. The project’s major challenge was the possible completion delay…

Read More

St. Joseph Regional Medical Center Remodel

The St. Joseph Regional Medical Center project was an 11,000 sq. ft. interior space renovation. 2nd floor storage and office space were renovated to relocate and expand the outpatient pharmacy and gift shop as well as creating additional office and break room areas. The relocation of the pharmacy and gift shop from the 1st floor…

Read More

St. Joseph Regional Medical Center Interim Cancer Center

This St. Joseph Regional Medical Center project was a 14,720 sq. ft. interior space renovation. The business office and hospice were relocated making a 10,000 sq. ft. area available for cancer treatment. The project finished successfully on time, and 10.8% under the GMP. When 3.09% in changes for unforeseen and owner added work is factored…

Read More

North Central District Health Department

North Central District Health Department Project was completed in 2001 and included a new office building and small clinic. Project included: Houses health department and local social service programs. Riff cut and open structural timber framing to mirror techniques used in late 1800s. Expanded parking lot with waffle pavers and grass for aesthetics and more…

Read More

St. Joseph Radiation Oncology Linear Accelerator Replacement

This St. Joseph Regional Medical Center project was a 2,080 sq. ft. interior space renovation to meet the Elekta specifications for the new Linear Accelerator. This project was successfully completed under the 5.11% GMP. When 5.36% in changes for unforeseen or owner added work is factored in, the project finished 10.47% under GMP. This project…

Read More